                                             Automatic Zoom                                             Actual Size                                             Page Fit                                             Page Width                                                                                          50%                                             75%                                             100%                                             125%                                             150%                                             200%                                             300%                                             400%                                         

 

 

Chapter  3:  Project  Management  

answers

Summer  2013,  Final  Exam

16)

The network below represents a project being analyzed by Critical Path Methods.

Activity durations are indicated on the network. Calculate the amount of slack time

at activity H.

A.

26

B.

3

C.

12

D.

9

E.

None of the Above

Answer: D

(a) Critical activities are A

-

C

-

J

-

K.

(b) The critical path is 26 time units.

(c) Slack at H is 9 units.

17)

A partially solved PERT problem is detailed in the table below. Times are given in

 

 

 

weeks.

Activity

Preceding

Optimistic

Time

Probable

Time

Pessimisti

c

Time

Expected

Time

Variance

A

--

7

9

14

1.361

B

A

2

2

8

0

C

A

8

12

16

0

D

A

3

5

10

1.361

E

B

4

6

8

0

F

B

6

8

10

0

G

C, F

2

3

4

0

H

D

2

2

8

1.000

I

H

6

8

16

2.778

J

G, I

4

6

14

2.778

K

E, J

2

2

5

0.250

Calculate the expected time for activity J.

A.

6

B.

8

C.

8.5

D.

9

E.

None of the Above

Answer: (a)

A=9.5 B=3 C=12 D=5.5 E=6 F=8 G=3 H=3 I=9 J=7 K=2.5

b) A

-

D

-

H

-

I

-

J

-

K; (c) 36.5; (d) 9.53, 3.09; (e) 0.13.

18)

A network consists of the following

list. Times are given in weeks.

Activity

Preceding

Duration

A

--

9

B

A

2

C

A

12

D

A

5

E

B

6

F

B

8

G

C, F

3

H

D

2

I

H

8

J

G, I

6

K

E, J

2

What is the duration of the critical path?

A.

32 weeks

B.

30 weeks

C.

63 weeks

 


Available solutions